This encompassed the following works to achieve a high-quality outcome:
- Manufacture / construction under licence of mass concrete blocks designed by QS for the purpose of constructing high strength load out bin separation walls, retaining wall system for ROM construction
- Mass excavations for concrete footings / fixed plant bases
- Installation and laying of direct laid electrical cables, conduits for communications
- Installation of poly water delivery pipework inclusive of electrofusion coupling welding
- Operation of onsite concrete batch plant capable of 100m3 of N40 concrete per hour
- Form, steel fix, place, pour and finish concrete: – slabs up to 300mm thick, pedestals, plinths, wheel stops, heavy equipment workshop plus other specialized concrete works
- Construct and install haul truck axle weighing scales
- Other construction projects to enhance quarry operations